PermitFilings

Demolition permits in Washington, DC

New demolition permits in Washington, useful for demolition, hauling and dumpster companies.

9last 7 days
98last 30 days
1trades
Nov 24newest permit

Newest permits

IssuedAddressWorkValueContractor
Nov 24607 14th St NW 4th Fl
Washington, DC
Demolition
CONSTRUCTION · ALTERATION AND REPAIR — NEW INTERIOR ALTERATION OF THE 4TH FLOOR. THE WORK CONSISTS OF NON STRUCTURAL DEMOLITION, AND NEW GENERAL PLUMBING, ELECTRICAL, AND MECHANIC
Mandy Leung
Nov 24820 South Capitol St SW
Washington, DC
Demolition
CONSTRUCTION · ALTERATION AND REPAIR — HISTORIC SITE Level 2 Alteration of the existing Randall Recreation Center (Phase 1). Interior renovation of the existing one-story building
Quinten Joseph Washington
Nov 24616 H St NW
Washington, DC
Demolition · Commercial
CONSTRUCTION · MISCELLANEOUS — Interior renovation of existing lower level office space and level 1-3 retail spaces. Scope of work include demolition, architectural, struc
Jordan Silberman
Nov 20600 13th St NW
Washington, DC
Demolition · Commercial
CONSTRUCTION · ALTERATION AND REPAIR — Interior renovation of existing office space on the 4th floor, including selective demolition and construction of non-load-bearing partition
Olufela Pyne
Nov 202539 Massachusetts Ave NW
Washington, DC
Demolition
CONSTRUCTION · ALTERATION AND REPAIR — Alteration/Repair of Existing Single-family structure. Full Mechanical, Electrical, and Plumbing Scope. Limited Structural framing changes t
Null Null; Robert Cross
Nov 201001 Connecticut Ave NW
Washington, DC
Demolition · Commercial
CONSTRUCTION · ALTERATION AND REPAIR — SUITE 515. Interior alteration to existing office space. Work includes partial demolition of non-structural partitions, new non-structural p
Stephanie Spruill
Nov 20600 19th St NW
Washington, DC
Demolition
CONSTRUCTION · ALTERATION AND REPAIR — Demolition of existing chillers, cooling towers, heat exchangers, and all associated piping. Replacement in kind with all new units and pipi
Jason Bentley
Nov 19704 7th St NW
Washington, DC
Demolition · Commercial
CONSTRUCTION · DEMOLITION — Historic (Chinatown District) DEMOLITION OF AN EXISTING 2,800 SQUARE FOOT RESTAURANT TO ACCOMMODATE A NEW RESTAURANT BUILD-OUT. THE DEMOLITI
Alicia Cologgi
Nov 191776 I St NW
Washington, DC
Demolition · Commercial
CONSTRUCTION · DEMOLITION — INTERIOR NON-STRUCTURAL SELECTIVE DEMOLITION TO 4TH FLOOR OFFICE SPACE. 21,029 SQUARE FEET. OGLETREE DEAKINS.
Sam Hollen
Nov 183601 Wisconsin Ave NW 307
Washington, DC
Demolition
CONSTRUCTION · ALTERATION AND REPAIR — Demolish Interior non-load bearing kitchen wall.
Null Null; Tolga Alper
Nov 18135 Adams St NW
Washington, DC
Demolition · Commercial
CONSTRUCTION · ALTERATION AND REPAIR — In the Bloomingdale Historic District Reinstate prior basement Certificate of Occupancy (CO 21494). Interior alterations include demolition
Anthony Scott
Nov 184432 Edmunds St NW
Washington, DC
Demolition
CONSTRUCTION · DEMOLITION — Interior demolition as shown on plans
Na Na; Ashleigh Ginley
Nov 181619 Evarts St NE
Washington, DC
Demolition · Commercial
CONSTRUCTION · ALTERATION AND REPAIR — INTERIOR DEMOLITION AND INTERIOR ALTERATION TO AN EXISTING SFD. UPGRADE M.E.P'S
Olivia Akinsan
Nov 184643 Minnesota Ave NE
Washington, DC
Demolition
CONSTRUCTION · ALTERATION AND REPAIR — DEMOLITION OF FIRST FLOOR WALLS (NON-BEARING) TO OPEN FLOOR SPACE TO KITCHEN IN THE REAR. RELOCATION OF EXISTING ELECTRICAL POWER & LIGHTING
Charles Bryant
Nov 171346 A St SE
Washington, DC
Demolition
CONSTRUCTION · DEMOLITION — Interior nonstructural demolition
Beth Davis
Nov 171009 E St SE
Washington, DC
Demolition
CONSTRUCTION · DEMOLITION — Historic (Capitol Hill District) Interior demolition of non-loadbearing walls, removal of ramp
Jennifer Fowler
Nov 16900 19th St NW
Washington, DC
Demolition · Commercial
CONSTRUCTION · DEMOLITION — Selective demolition of existing office space on the 5th and 6th floors. Infill floor penetrations where demolition of items occurred. Exist
Mandy Leung
Nov 163220 N St NW
Washington, DC
Demolition · Commercial
CONSTRUCTION · ALTERATION AND REPAIR — Historic and CFA Nonstructural interior renovations for a UPS Store. Work to include minor demolition of flooring, wall base, security gate,
Vanessa Cantu
Nov 161301 Pennsylvania Ave NW
Washington, DC
Demolition · Commercial
CONSTRUCTION · MISCELLANEOUS — PROJECT SCOPE IS TO RENOVATE A PORTION OF THE SIXTH, SEVENTH, AND TENTH FLOORS OF AN EXISTING FOURTEEN STORY, B-BUSINESS USE BUILDING. SCOPE
Milli Vasquez
Nov 161120 19th St NW
Washington, DC
Demolition · Commercial
CONSTRUCTION · ALTERATION AND REPAIR — Suite #410 General Scope of Work: Interior build-out/renovation of an existing commercial suite for a periodontics dental practice. Scope in
Megan Alger

83 more permits in the last 30 days in Washington.

See them all from $9/month Get free weekly alerts

Permits by trade, last 30 days

Demolition98

Get these permits by email

Leave all unchecked for every trade.

By signing up you agree that Brinkman Ventures, LLC and its companies may email you, as described in our privacy notice. Unsubscribe any time.